Southington Water
(860) 628-5593
605 West Queen St, Southington, CT 06489
Mon-Fri 8:30 AM - 4:30 PM

Temporary Construction Meter

 

The Department offers contractors the use of a 3/4" meter which must be set in a secured, insulated or heated area on their construction site.  A deposit of $400.00 will be required prior to the meter set. The meter will removed when the permanent meter is set.  At such time, consumption and fees will be calculated and a bill will be generated against the deposit.  A bill or a refund will be issued.  

Please click link below for details:

Temporary Construction Meter